Factory drop testing

When to Repeat a Drop Test After a Jewelry Cabinet Changes

Staff handling cabinet components at the packing workbench

A small production change can undo a successful packaging design. A mirror frame made wider may press against an insert. A new stand adds weight at one end. A thinner divider changes where a loose bag rests. Start every product or packaging change by comparing it with the exact unit and pack revision in the last evidence file.

Change during manufacture What might change in transit What to ask for
Heavier mirror, frame or base Gross packed weight, balance and the selected test severity Weighed pack and classification review
New panel shape or dimensions Corner loading, unsupported span and carton fit Updated fit check and revised packaging drawing
New carton or insert material Compression and shock behavior Production material spec and a new evaluation plan
Moved hardware or adaptor Contact with glass or an open compartment Revised packing map and unpacking demonstration
Route or retailer changes Handling conditions and required procedures A protocol review with the receiving channel

Before a repeat test

Identify the old and new revisions in a short change record. Use the current production configuration as the specimen and preserve the original failed or passed report. If a revised part can affect fit or distribution stress, the buyer and lab should agree whether to run the full sequence or a documented supporting comparison. A side-by-side internal drop can help narrow a likely cause as long as the comparison conditions are recorded. It does not overwrite the underlying approval.

After a failure

Keep the packaging and the cabinet together until the team can match a damage point with the expected impact path. Classify the defect, record what moves inside the package and separate an execution error, such as a missed insert, from a design problem. Update the packing instruction and let the normal packing line produce the retest unit. Retesting a specially prepared carton can hide the problem that will recur on production.

Close the record with the authorized revision and decision. Send it to purchasing, the packing supervisor and the inspector. Your next order should cite the revision, rather than relying on the words “same as last time.”

References

All buyer guides